Road surface being prepared for paving in Huntington

Some repaving is taking place on Huntington Street in Shelton, with sections of the road having been milled down in preparation for new asphalt. (Photo by Brad Durrell)

Shelton-HuntStPaving-WIFI

Signs warn drivers of the temporary drop-offs in the road surface. This photo shows one such section near Buddington Road.

Huntington Street connects lower Bridgeport Avenue (Route 8, Shelton/Trumbull/Stratford border) to the Huntington Green.

 

 

By participating in the comments section of this site you are agreeing to our Privacy Policy and User Agreement

© HAN Network. All rights reserved. Shelton Herald, 1000 Bridgeport Avenue, Shelton, CT 06484

Designed by WPSHOWER

Powered by WordPress